Website powered by

Power Critical

The 2451 Global DeSync took out power across 99% of Megastructure 5's (MS5) sectors. With the sectors hi-tech focus on Production, Incubation and Incarceration, the backup power had a finite supply, not enough to last the blackout. The resulting situation in the sector was complicated and messy, Premature synthetics suffered a gruesome birth.

Andrew porter 04 phandy2017 underpipes render
Andrew porter 04 phandy2017 underpipes design